|
|
|||||
|
Jackson City Amphitheater
Preliminary planning
and feasibility study for downtown amphitheater
Measured drawings of
40 houses to be renovated
Client: Farish
Street Historic District Neighborhood Foundation;
Michael Hervey,
Executive Director
Hatten Community Center and Childcare
Facility Feasibility Study
Feasibility study and
assistance with USDA grant application
Client:
Junction Ridge Consulting Group
Medicinal Plant Greenhouse Farm and
Processing Facility
Preliminary site
planning
Client: Alcorn State
University
Earth Lab Staff Building
Preliminary planning
of staff housing for Camp Bratten Green and Earth Lab
Design and
construction administration of fully sustainable house for
Earth Lab
Eco Village Master Plan
Programming and
overall site planning for the Eco Village at the Gray Center
Prototype house for a
family and attached dependant elderly or disabled person
Design and
construction administration of a house as a designer show house
Client: Fondren
Renaissance Renewal, Camp Best, Executive Director
Cedar House Relocation Feasibility Study
Feasibility study for
the reuse on relocation of a historic house
Client: Fondren
Renaissance Renewal, Camp Best, Director
|
|
||||
|
|
|||||
|
|
|||||
|
|
|||||
|
|
|||||
|
|
|||||
|
|
|||||
|
|
|||||
|
|
|||||
|
|
|
|
|
|
|